| PECOFacet DPRC Building Concepts | ||
| by the Sedalco Team | ||
| VE No. | Title | |
| 0 | BASE BID FLY THROUGH | View Video |
| 1 | ECONOMIZERS | View Video |
| 2 | (3) SMALLER AIR COOLED CHILLERS INSTEAD OF (2) 275 TON AIR COOLED CHILLERS | View Video |
| 3 | FUME HOOD EXHAUST FANS COATED WITH EPOXY INSTEAD OF STAINLESS STEEL | View Video |
| 4 | MECHANICAL ROOM LAYOUT AND 3D DESIGN |
View Video |
| 5 | VARIABLE AIR VOLUME DESIGN IN THE OFFICE SPACE | View Video |
| 6 | SAFETY SHOWER AND MIXING VALVE – IT'S IMPORTANT! | View Video |
| 7 | ELEVATOR MECHANICAL SYSTEM DISCUSSION | View Video |
| 9 | OVEN CHANGE ORDER | View Video |